Uline H -9013 Manual Del Usuario página 3

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Figure 5
Figure 6
PAGE 3 OF 9
ASSEMBLY CONTINUED
ATTACH HANDLES
1. Place one handle on side of one support panel. Align holes
2. Insert four Phillips head bolts through holes in handle. Thread
3. Repeat steps 1 and 2 for second handle on opposite side
ATTACH CASTERS
1. Lay pegboard cart on its side so the bottom of the deck is
2. Place one caster on the bottom of the deck. Align caster bolt
3. Insert four long bolts through the holes in the deck and the
Close View
4. Repeat steps 2 and 3 for remaining casters. Install rigid
5. Tighten all bolts and nuts on entire pegboard cart.
1-800-295-5510
uline.com
on handle with holes on support panel. (See Figure 5)
on M5 flange nuts. Secure using 8 mm wrench and #2 Phillips
screwdriver, but do not tighten. (See Figure 5)
support panel.
accessible. (See Figure 6)
holes with holes in the deck.
(See Figure 6)
caster. In this order, slide one washer and one M8 flange nut
onto each bolt. Secure using 12 mm and 14 mm wrench, but
do not tighten. (See Figure 6)
casters on one end and swivel casters with brakes on the
opposite end.
1120 IH-9013

Publicidad

Tabla de contenido
loading

Tabla de contenido