1.
Determine board location. Position top hanging
brackets 6" from outside edge of board with bracket
holes 2 " from top of board. (See Figure 1)
6"
2. Mark wall at centers of bracket holes. (See Figure 2)
3. Drill holes for each hanger in marked locations using
a 1/4" drill bit. (See Figure 3)
6"
2¾"
Figure 2
1.
With board hanging on top brackets, align
L-brackets with pre-drilled holes (located on bottom
of frame) and mark position. (See Figure 6)
2. Remove board and mark
wall 1 " from bottom
of L-brackets.
(See Figure 7)
PAGE 2 OF 6
TOP HANGING BRACKET MOUNTING
Figure 1
1/4" Drill Bit
Figure 3
BOTTOM L-BRACKET MOUNTING
Figure 6
Figure 7
1-800-295-5510
uline.com
4. Insert wall anchors into holes,
flush with the wall. Insert 1
" screws through hanging
brackets, into the wall anchors.
Tighten firmly. (See Figure 4)
5. Lower board onto the
top hanging brackets
so built-in brackets on
upper board frame are
engaged.
(See Figure 5)
3. Drill holes in marked locations
using 1/4" drill bit. Insert wall
anchors into holes flush with wall.
4. Insert 1 " screws through
L-brackets into wall anchors.
Secure, but don't overtighten.
(See Figure 8)
5. Hang board and insert 1/4"
screw and washer through
each L-bracket and into
predrilled hole in frame.
Tighten firmly. (See Figure 9)
Figure 4
Side View
Figure 5
Figure 8
Figure 9
0821 IH-3040