Bachmann 702.5000 Manual De Operación página 16

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 22
4.
Operation
4.1
Charging
Please ensure that the MOV:E power unit is fully charged before using it for the first time.
When the charge level is low, the first LED in the control panel flashes
Charge the MOV:E power unit using the power supply unit supplied.
During the charging process, the LED indicator lights up blue.
Please note: During the charging process, the energy store must stand vertically on a solid
and dry surface.
Charging time: up to 100% approx. 2-3 hours
We also recommend using the optional MOV:E charging station (item no. 702.5200)
Charging option with optional charging station (Art.Nr. 702.5200) (not included in the scope of de-
livery)
.
Note: Charge the MOV:E Power Unit only with
the power supply unit supplied
.
16

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

702.5001702.5100702.5101

Tabla de contenido