Equipment Installation - Tripp-Lite SRWOSHELFSM Manual Del Propietário

Entrepaño para instalación en pared para racks de marco abierto
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Assembly
Step 4 To mount the rack, first find the studs in your wall/mounting surface and make all measurements and/or guide
marks.
Step 5 With user-supplied hardware, mount the Rear Panel to the wall. The Rear Panel can accommodate 5/16" lag bolts.
SRWOSHELFSM

Equipment Installation

The SRWOSHELFSM can support a maximum equipment load up to 200 lb. (90 kg).
The SRWOSHELFLG can support a maximum equipment load up to 250 lb. (113 kg).
For all other equipment mounting, please refer to the intended equipment's Owner's Manual for equipment installation
instructions. Typically, this information can be found in the "Mounting" or "Rack Mounting" sections of the manual.
SRWOSHELFLG
4

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Srwoshelflg

Tabla de contenido