Operation; Commissioning; First Operation; Description Of Pictograms - Edesa Hydra Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Overview

1. Commissioning

1.1. Filling of the tank
Open one or several hot water taps.
Open the cold water tap on the security group (make sure that the drain valve is closed).
When water starts flowing from the hot water taps close them. The tank is full.
Check the connections for possible leaks.
Check the correct function of valves and safety group by opening them several times in order to eliminate
possible particles.

1.2. First operation

If the water heater has been tilted wait for minimum 1h before operation.
Access to mode
and settings
Confirm
Increase of hot water
production

2. Description of pictograms.

Consigne eau chaude
Fast heating confirmed
Absence registered / in operation
Reception of signal on photovoltaic
Installation

Operation

Operation
MANUAL
BOOST
Maintenance
Check the information
Follow the instructions
Navigate
Increase the values
Return to previous screen
Navigate
Reduce the values
Electric backup working
Heat pump working
Anti-legionella heating cycle
Waiting
Warranty
EN
69

Publicidad

Tabla de contenido
loading

Productos relacionados para Edesa Hydra Serie

Tabla de contenido