Set-Up And Operation - Denios SPILLGUARD CONNECT Manual De Instrucciones

Ocultar thumbs Ver también para SPILLGUARD CONNECT:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Now create an account and read through
3.
the General Terms and Conditions as well
as the Privacy Policy.
Sign Up
muster@denios.de
•••••••••
DENIOS AG
Dehmer Straße 58-66
By signing up, you agree to
our terms of service
SIGN UP
Following successful registration, the
4.
SpillGuard® connect web application
opens automatically
22/48
3.4. Activating and configuring
SpillGuard® connect
Press the button „Activate device"
1.
+
Activate device
Complete all the data fields.
2.
Notice:
The more complete your data, the more
efficiently and specifically the information
will be transmitted in the event of an
emergency!
Click „Save" to save your data
3.

4. Set-up and operation

4.1. Switching on and calibrating
SpillGuard® connect
Position SpillGuard® connect at the lowest
1.
point of the spill sump with the sensor
surface towards the bottom.
Press and hold the Push button until the
2.
beep sounds.
1 beep
LED flashes quickly
LED
The calibration process is complete after
3.
approx. 30 seconds.
2 beeps
LED flashes once a minute
LED
SpillGuard® connect is ready for
operation.
4.2. Calibration for a new location
When installing SpillGuard® connect in a new
location proceed as follows:
Press and hold the button until the beep
1.
is heard to switch off SpillGuard® connect.
1 beep
Position SpillGuard® connect in the new
2.
location.
Press and hold the button until the beep
3.
is heard.
1 beep
LED flashes quickly
LED
The calibration process is complete after
4.
approx. 30 seconds.
2 beeps
LED flashes once a minute
LED
SpillGuard® connect is ready for
operation.
SpillGuard® connect Quick Guide | 276016 | Rev. 1
23/48

Publicidad

Tabla de contenido
loading

Tabla de contenido