Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 34

►MAINTENANCE

• Ensure that the fixing screws, caps and cable glands are
tight.
• Verify that the weight of the cable is supported by the strain
relief mechanism and not by the terminal connections.
• Check the cleanliness of contacts. Any deposit can be
rubbed off with a clean cloth or compressed air. If necessary,
replace damaged contacts. Any deposit can be rubbed off with
a clean cloth or compressed air. If necessary, replace
damaged contacts.
• Periodically inspect IP gaskets for wear and tear. Replace as
necessary.
• Regularly check the continuity of the earth circuit by electric
tests.
IS 24 [PN/PN HT] Rev B.0 - 2022-02
16/58
.
,

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pn ht

Tabla de contenido