Maintenance
17
The indicated amount of maintenance is just the minimum
requirement. The frequency of maintenance depends on
the intensity of use.
The frequency of maintenance is determined by the appli-
cable, country-specific requirements! This may result in
considerably shorter maintenance intervals; the relevant
country-specific specifications and standards must be
observed.
NOTE
Only use original BAYROL Technik components. The use
of third-party components can lead to malfunction
during operation. BAYROL Deutschland GmbH disclaims
all liability and warranty for this.
Hose replacement dosing pump:
MAINTENANCE PLAN
Weekly check:
–
Make sure you keep your filter system in perfect condition.
–
Check the pH value, preferably with a BAYROL Technik
Electronic Pool Tester.
–
Carry out a visual inspection of the system for leaks in all
components, lines and hoses.
Annual maintenance:
–
Replace the pH sensor and calibrate it.
–
Replace the dosing pump hoses.
–
Check the pH-injection valve and replace it if necessary.
27