Descargar Imprimir esta página

Preparation For Operation; Cleaning And Maintenance - MSW Motor Technics MSW-CP-600-25 Manual De Instrucciones

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 39

3.2. Preparation for operation

POSITIONING OF THE UNIT
The device should always be used on a level, stable surface, ensuring that the
underlay adheres to the substrate with its entire surface.
The load-bearing capacity of the pads is guaranteed by maintaining the design
proportions. The contact area between the stabilizer foot (2) and the pad (1) must
not be less than 1/3 of the pad area.
The pad underneath the stabilizer legs must be centered.
CAUTION!
the unit!
The sub-floor under the base plate must be checked especially during heavy rainfall.

3.3. Cleaning and maintenance

a)
After each cleaning, all the parts should be dried well before the unit is used
again.
b)
Store the unit in a dry and cool place protected from moisture and direct
sunlight.
Always select the base plate according to the load capacity of

Publicidad

loading

Este manual también es adecuado para:

Msw-cp-500-18Msw-cp-400-12Msw-cp-300-7Msw-cp-300-7h