Descargar Imprimir esta página

Publicidad

Idiomas disponibles

Idiomas disponibles

Electrical connections on the device
9
IMPORTANT
The controller must be grounded and the mains supply
must be equipped with a residual current protection (30 mA).
Commissioning
10
As soon as the water values have been set and your unit
with all its components has been installed, you can start
commissioning your Automatic
Switch on your Automatic
on the display. You will be taken through the initial Setup
Operation
11
Tap in the blue frame areas to access
the respective context menus.

Access codes

User code
Service code
1234
Redox­Sensor
USB connection
pH­Sensor
Paddle­Flow­Switch
Temperature Sensor
.
SALT
and follow the instructions
SALT
Status icons pH
Operation mode
Indicator dosing pump pH
5678
fill level of canister (red, if empty)
1
2
3
4
5
6
Cover cable (191049 Cable 2.5 m for cover)
7
Level switch (e.g. 172130 KIT Level Automatic single
8
Electrolysis cell
9
Mains supply
(must remain powered continuously)
Wizard, which will help you with the essential settings.
Of course, you can also access all the settings you have
made later and adjust them, if necessary.
As soon as the individual steps have been completed,
the Automatic
SALT
starts operation.
Status icons Electrolysis
Operation mode
Polarity
Cover
Winter
33

Publicidad

loading