Descargar Imprimir esta página

Inspection And Maintenance Plan - Gude GBM 87.1 Traducción Del Manual De Instrucciones Original

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 46
ENGLISH
28

Inspection and maintenance plan

Regular servicing period
Engine oil
Inspection
(15W 40)
Change
max. 0,6 l
Spark plug
Inspection
cleaning
Change
Air filter
Inspection
cleaning
Change
Check the petrol level
Safety device check
Drain the petrol tank
Check the screwed connec-
tion
Check the cables
Clean the machine
thoroughly. Spray the skids
and plough with oil
Provide appropriate servicing upon the earlier of the following in the given month or after the specified hours of
operation have expired.
Before
After 1
any start-
month
up
20
Hours of
operation
After every
take out of
service
After 3
After 6
months
months
50
100 Hours
Hours of
of opera-
operation
tion
After 12
At the
months
end
of the
300 Hours
season
of opera-
tion

Publicidad

loading

Este manual también es adecuado para:

95456