ISC B102 Manual De Instrucciones página 19

Pinza amperometrica
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Power supply earth
Figure 11: Configuration in TNC system.
"TNS" SYSTEM
To measure the currents deriving from faults, separate the PE wire from the active wires.
Power supply earth
Figure 12: Configuration in TNS system.
2.3.3
"IT" SYSTEM
To measure the fault currents, clamp the active conductors (Neutral included when distributed).
Please note that the intensity limit for the current resulting from the fault is obtained either by inserting
an impedance between a supply point (generally the Neutral supply) and Earth.
Power supply earth
Figure 7: Configuration in IT system.
1, 2, 3 : measurement points
1, 2, 3 : measurement points
1, 2, 3, 4, 5 : measurement points
19

Publicidad

Tabla de contenido
loading

Productos relacionados para ISC B102

Tabla de contenido