32 / EN
LINE 1 (L1)
LINE 2 (L2)
GROUND
POWER SUPPLY
12 kW (220 V~)
Follow the numbered steps below for a correct installation:
1.
Check that the voltage is appropriate for this appliance, you can verify the
voltage on the product data label.
2.
Install the water heater as close as possible to the electric current (charging
center), with the voltage that will be used, which must be accessible and must
include a switch break or QO breaker.
3.
As a safety measure it is obligatory to install a thermo-magnetic circuit breaker
according to the model (see the electrical specifications table) independently
of the main line, for automatic deactivation in the case of an electrical fault or
imbalance.
4.
Extend or lead the independent cables from the power supply through a conduit
tube or polyduct to the heater.
Eleva 12 kW V2
-RT1
-RT2
-RT3
-K1
-K2
-H.E.1
-H.E.2
-H.E.3
-RR
-S1
-S2
-H1
-H2
-H3