Descargar Imprimir esta página

Commissioning, Measuring, Calibration - Xylem WTW ADA 94/IDS DIN Instrucciones De Operación

Publicidad

Idiomas disponibles

Idiomas disponibles

ADA 94/IDS DIN / ADA 94/IDS BNC
Commissioning
Example
Multi 9630 with
mounted adapter
ADA 94/IDS DIN
ba75969e02
08/2015

Commissioning, measuring, calibration

1
Unscrew the 4 screws of the cover plate (the screw driver is included
in the scope of delivery).
2
Insert the ADA 94/IDS adapter in the open mounting slot.
3
Attach the adapter to the meter with the 4 screws.
1
1
pH electrode
2
Temperature sensor (NTC 30)
3
Reference electrode
The further commissioning steps are given in the operating manual of the pH
electrode.
4
Connect the electrode to the socket of the adapter.
5
Calibrate the electrode according to the operating manual of the me-
ter.
All further details are given in the operating manuals of the pH electrode and
meter.
2 3
General information
6

Publicidad

loading

Este manual también es adecuado para:

Wtw ada 94/ids bnc