STEP 14 - UPPER CABLE
IMPORTANT: STUDY AND FOLLOW
2,95m
THE DIAGRAM CAREFULLY.
A. Attach the 2,95m Upper cable (86) through
the opening of the Upper frame (2). Place the 1st
Pulley (103) below the cable and secure the pulley
using 1 Allen bolt M10x45t (61), 2 Washers Ø10 (69) and 1
Lock nut M10 (68).
B. Put the cable around and backwards and place the 2nd
pulley below the cable, fix the pulley with the same way in A.
C. Put the cable around the pulley and front, place the 3st pulley
below the cable and secure it with 1 Allen bolt M10x140 (56), 2 Washers Ø10 (69) and 1 Lock nut M10
(68).
D. Draw the cable around the pulley and backwards, place the 4th pulley below the cable and secure it
with the same way in A.
E. Draw the cable around the pulley and downwards, place the 5th pulley onto the cable, secure the
pulley with Double pulley bracket (36) with the same way in A.
F. Draw the cable around the pulley and upwards, place the 6th pulley below the cable and secure them
with the 1 Allen bolt M10x65 (59), 2 Bushing (72) and 1 Lock nut M10 (68).
G. Draw the cable around the pulley and downwards, thread the end of the upper cable to the top
opening of the selector rod at least 5 laps to keep safe.
22