Descargar Imprimir esta página

Barrette LOUVERED GATE KIT Instrucciones De Instalación página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

1.
a. Apply provided vinyl cement to all inside
surfaces of the uprights where the rails will be
installed (Fig. 1).
b. Install top and bottom rails into one gate
upright (Fig. 2).
2.
Install all infill boards into gate upright with rails
(Fig. 3).
3.
Install final upright insuring that infill boards and
rails line up with routes (Fig. 4).
Vinyl Cement
Upright
Assembly
90º
Fig. 1
Fig. 2
Fig. 3
Fig. 4
3

Publicidad

loading