INSTALLATION INSTRUCTIONS
Before putting your service cellar into
service
● Remove all inner and outer packaging
components.
● Check that none of the following parts are
missing:
- 3 removable shelves
- 1 operating manual
● Before connecting your device to a power
supply, allow it to stand upright for about 2
hours. This reduces the risk of malfunction of
the refrigeration
system due to handling during transport.
● Clean the inner surfaces of the unit with a
soft cloth and warm water.
● Place your unit on a floor strong
enough to support the weight of the
fully filled unit.
● Make sure the unit is level by adjusting the
front feet underneath the unit. Make sure
that the cellar rests on its feet in a stable
manner.
- 05 -