COMMMISSIONING
10.3.2 Wire size

Connection wiring
Recommended minimum sizes for field provided wires:
Model
Power supply
All Indoor Units
1~ 230V 50Hz
RAS-(4-6)HVNC1E
RAS-(4-6)HNC1E
3N~ 400V 50Hz
?
N O T E
Follow local codes and regulations when selecting field wires, Circuit
breakers and Earth Leakage breakers
Use the wires which are not lighter than the ordinary polychloroprene
sheathed flexible cord (code designation H05RN-F)
11 COMMMISSIONING
When installation is completed, perform test run according to the following procedure, and hand over the system to the customer.
Perform test run regarding indoor units one by one in order, and confirm that the electrical wiring and the refrigerant piping are
correctly connected.
Test run should be performed according to the
page.
!
C A U T I O N
Do not operate the system until all the check points have been cleared:
Check to ensure that the electrical resistance is more than 1 MΩ,
by measuring the resistance between ground and the terminal of the
electrical parts. If not, do not operate the system until the electrical
leakage is found and repaired. Do not impress the voltage on the
terminals for transmission 1 and 2.
Check to ensure that the stop valves of the outdoor unit are fully
opened, and then start the system.
Check to ensure that the switch on the main power source has been
ON for more than 12 hours, to warm the compressor oil by the oil
heater
Pay attention to the following items while the system is running:
Do not touch any of the parts by hand at the discharge gas side,
since the compressor chamber and the pipes at the discharge side
are heated higher than 90°C.
DO NOT PUSH THE BUTTON OF THE MAGNETIC SWITCH(ES), it
will cause a serious accident.
Do not touch any electrical components for more than three minutes
after turning OFF the main switch
Confirm that the gas line stop valve and the liquid line stop valve are
fully open.
Confirm that the leakage of the refrigerant does not exist. The flare
nuts are sometimes loosened by vibration during transportation.
Check that the refrigerant piping and the electrical wiring conform to
the same system.
Confirm that the dip switch setting on the printed circuit board of the
indoor units and the outdoor units are correct.
Check whether or not the electrical wiring of the indoor units and the
outdoor units are connected as shown in the chapter
wiring".
17
PMML0395B rev.0 - 11/2015
All manuals and user guides at all-guides.com
Power source
Transmitting
cable size
cable size
EN60 335-1
EN60 335-1
0.75 mm²
6.0 mm
0.75 mm²
2
4 mm
2
"11.1 Test Run procedure by Remote Control Switch (PC-ART example)"
"10 Electric

Main switch protection
Select the main switches in according to the next table:
Model
Power supply
All Indoor
1~ 230V 50Hz
Units
ELB: Earth switch; CB: Circuit braker
Outdoor unit
MC (A)
RAS-4HVNC1E
28.5
RAS-5HVNC1E
28.5
RAS-6HVNC1E
28.5
RAS-4HNC1E
15.5
RAS-5HNC1E
15.5
RAS-6HNC1E
15.5
!
C A U T I O N
Confirm that field-supplied electrical components (main switch fuse, fuse-
free breaker, earth leakage breakers, wires, conduit connectors and wire
terminals) have been properly selected according to the electrical data
given in the Technical Catalog of the unit and ensure that the components
comply with national and local codes.
?
N O T E
For twin, triple and quad check the indoor unit outlet air temperature
at test run. If the temperature difference is large (aprox. 10 deg. or
more (cooling) 20 deg. or more (heating) recheck the refrigerant
piping, Installation may have some problem.
In the case of anual cooling optional function, cut JP1 out and set
the DSW6-1 to OFF. (Individual control is not available when anual
cooling is selected).
Max.
CB
ELB
current
(A)
(nº poles/A/mA)
(A)
5.0
6
2/40/30
CB (A)
ELB
32
32
2/40/30
32
20
20
4/40/30
20
on next