11
10
9
O
10 11
9
23. Repeat the same procedures to attach the Left Side Frame (M) at the opposite side.
24. Now, go back and securely tighten all the cam locks and screws. Make sure that all the parts are tight and
there are no gaps between the parts. This will help keep the unit square.
25. Ask for help to lift the assembled unit upright and position it near the final location.
26. To insert the assembled drawers to the frame, extend the Ball Bearing Slide Tracks on the unit all the
way forward (including ball bearing cart), then align the Slide Runners on the assembled drawers with
the Slide Tracks and push the drawers carefully inside until it stops.
NOTE: If the drawer does not go in smoothly, please take it out and repeat the step. If you need to
remove the drawer, please pull the drawer all the way out, then simultaneously pushes the plastic release
lever of the ball bearing slides up on one side and down on the other side, and then pull it completely out.
Assembly Instructions
M
O
B
N
A
G
M
G
14
8
10
11
M
B
Ball bearing cart
FRONT
FRONT
Ball bearing cart
Drawer Installation