Descargar Imprimir esta página

Goodwe GM3000C Guía De Instalación Rápida página 74

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 21
Commissioning
07
Power ON
Step 1 Connect the meter cables.
Step 2 Power on the inverter and make sure that the inverter is working normally. Then the
meter is powered on.
Commissioning the Meter
Set the CT parameters using the SolarGo APP (system comprised of a single three-
phase unit,with the Export function enabled)
When the GM3000C is used with the Inverter such as BTC series or ETC series etc., please
refer to the corresponding user manual for CT-related parameter settings.
Before setting the parameters, make sure that:
1. The DC side of the inverter is powered on, but no output on the AC side.
2. The SolarGo APP has been downloaded from Google Play or App Store.
3. Communication is functioning properly between SolarGo APP and inverter.
4. Please use the initial password when logging in for the first time, and change it as
soon as possible to one that is memorable for you. To keep your account secure, it is
recommended to change your password regularly.
Quick Installation Guide V1.0 -2022 -11-09
SolarGo App
NOTICE
72

Publicidad

loading