Descargar Imprimir esta página

Maintenance And Care - Mato EP 100 Instrucciones De Empleo

Publicidad

Idiomas disponibles

Idiomas disponibles

Operating instructions
EP100 - EP400
5

Maintenance and care:

The electric vane cell pump works maintenance free.
Regularly check the pressure-bearing components (pressure hose and oil filler gun) as well as
the current-carrying parts of the pump for any damage or wear. Defective parts must be
replaced immediately with genuine parts.
Ordering spare parts:
When ordering spare parts the following information is required:
Type specification, designation of the ET, order number
The following maintenance periods should be strictly observed to ensure trouble-free operation.
Safety valve
Seal set
Pressure hose
Oil filler gun
Testing portable electrical
appliances. Operator
Checking for loose
connections
Legibility and availability of
information
6
Tips for fault diagnostics:
Symptom
The motor is not running.
Device does not
discharge any oil.
Device continues with
production.
MATO
/ Benzstr. 16-24 / 63165 Mühlheim a. Main / Tel:+49(0)6108-906-0 / Fax:+49(0)6108-906-120
GmbH & Co. KG
Before each use
X
X
X
X
Possible cause
Mains plug not in the socket
The wiring to the motor is faulty.
The container is empty.
Foot valve is faulty.
Suction basket added.
Annually
According to the
manufacturer
X
X
X
X
½ yearly
X
Rectification
Insert mains plug into the socket.
Repair by an electrician.
Check the level of the oil container.
Press reset button.
Exchange foot valve.
Clean suction basket.
X
X
X
X
11

Publicidad

loading

Este manual también es adecuado para:

Ep 200Ep 300Ep 400