3. TRANSPORT, PACKAGING AND STORAGE
3.1 Inspection after transport
Verification of the absence of damage and the integrity of the device must be carried out upon receipt of the
package. In the event of identification of damage due to transport, refuse or accept the product delivered only
under reserve *. A complaint detailing the defects observed must then be made. The collection of damages
is only possible in the event of a complaint made within the time limits provided, i.e. 24-48 hours maximum
(see CGV Casselin).
* written on the right paper or digital delivery from the carrier.
3.2 Packaging
The packaging of the device must be kept in the event of a move, or for a return to the after-sales service.
The interior and exterior packaging must be completely removed before using the device. The standards in
force in your country concerning the protection of the environment must be respected before destroying the
packaging.
3.3. Storage
WARNING
The storage of the device in stock can be done but only in its original closed packaging.
Storage can be carried out under these conditions:
• Storage in a dry, non-humid place
• Sheltered from the sun
• Control of stock for more than 2 months (general condition of the device and all the elements that make it
up)
• No material shaking
• Storage in a closed room and not outside.
4. MATERIAL CHARACTERISTICS
* Subject to change
Model
Plate coating
plate type
Powerful
Plate size
Dimensions
Weight
CGPL
Lava stone (5 Kg)
Grooved
6500W gas
W 312 x D 483 mm
W 330 x D 540 x H 220 mm
17.5kg
CGPLD
Lava stone (10 Kg)
Grooved
13,000W gas
2 x W 312 x D 483 mm
W 660 x D 540 x H 220 mm
32.8kg
EN