Kindly read the manual carefully before using.
Warning
1. The installation and test of bathtub must be operated by qualified electrician or professional person
who assigned from dealers.
2. The bathtub should be installed in the correct zone and that equipotential bonding is carried out.
3. The floor has to be capable of supporting the expected load.
4. Be sure to use the qualified water. And pH values and chlorine concentrations of water should be in
the level of standard.
5. Do the cleaning and regular disinfection to keep the bathtub clear. See detail in part of CLEAN AND
MAINTENANCE. To keep the bathtub clear, and better to use a cover if it left empty for a long time.
6. Using drainer system in bathtub to make water out. Be sure to drain water out after using in case
water freezing in winter.
Installation
1. Open the cartons to check whether the bathtub has defects, and the availability of fittings.
2. Put the bathtub into a pre-determined place, than adjust the feet to make the bathtub at a
horizontal position stabled.
Lead the drainpipe to the preformed floor drain. Then set the bathtub tube into the right place.
Doesn't extruding bending, chocking drain pipe, make sure the bailing smoothly.
Installation Steps
1. Confirm the place of drainer and install drainer in right place.
1