Descargar Imprimir esta página

Hermex 1.8576 Instrucciones De Montaje página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

35586 – Chalkboard Table
Components:
Part
Name
Components:
Part
A.
Table Top
Fijaciones y herramientas necesarias:
A.
A
A
B
B
Table
C
C
1. Comprobar que tengamos todos los componentes.
Qty
Part
Name
2. Colocaremos la parte superior de la mesa boca abajo y colocaremos una de las
1. Check you have all the components.
1. Check you have all the components.
patas en un extremo de la parte superior de la mesa. A continuación,
1
B.
Leg
atornillaremos la pata con los agujeros previamente perforados para tal efecto, y
en la dirección indicada en la imagen.
Qty
Part
Name
Part
Name
4
C.
Shelf
5. Position part C as shown leaving a
3. Repetiremos el paso 2 con las patas
5. Position part C as shown leaving a
C.
Shelf
2. Position part A & one of part B as
100mm gap as indicated.
restantes.
100mm gap as indicated.
shown. Screw into place through the
nts.
pre-drilled holes in the direction
indicated.
We would love to hear your feedback on our products & assembly instructions. Also if you have any problems assembling our products then don't hesitate to ask Al:
We would love to hear your feedback on our products & assembly instructions. Also if you have any problems assembling our products then don't hesitate to ask Al:
3. Repeat step 2 with remaining parts B.
. Repeat step 2 with remaining parts B.
Qty
Part
Name
Name
Qty
Part
1
B.
Leg
Table Top
1
B.
A. Parte superior de la mesa
B. Patas (4 uds.)
C. Estante inferior de la mesa
D. Bolsa de tornillería
2. Position part A & one of part B as
2. Position part A & one of part B as
shown. Screw into place through the
Qty
Part
Name
shown. Screw into place through the
pre-drilled holes in the direction
4
C.
Shelf
pre-drilled holes in the direction
Assembly Instructions
Assembly Instructions
Qty
Part
Name
Qty
Part
Name
1
D.
Bag of Screws
6.
Screw into place through the pre-drilled
4. Les mostramos en la imagen como
6.
Screw into place through the pre-drilled
1
D.
Bag of Screws
holes in the direction indicated.
debería quedar montada hasta el
holes in the direction indicated.
momento.
3. Repeat step 2 with remaining parts B.
4. Position the completed section as
4. Position the completed section as
C
C
Qty
Part
Name
Qty
Part
4
C.
5. Colocaremos el estante inferior
Leg
4
C.
dejando 10 mm de espacio previamente
1. Check you have all the components.
indicado; tal y como se muestra en la
1. Check you have all the components.
imagen.
Qty
Part
3. Repeat step 2 with remaining parts B.
7. Atornillaremos el otro lado siguiendo
3. Repeat step 2 with remaining parts B.
5. Position part C as shown leaving a
5. Position part C as shown leaving a
1
D.
indicated.
las instrucciones del paso 6 y la imagen.
indicated.
We would love to hear your feedback on our products & assembly instructions. Also if yo
We would love to hear your feedback on our products & assembly instructions. Also i
Qty
Qty
1
7. Screw into place through the pre-drilled
7. Screw into place through the pre-drilled
1
holes in the direction indicated.
4. Position the completed section as
Email us your
Email us your
ideas@cosydirect.com
ideas@cosydirect.com
alastair@cosydirect.com
alastair@cosydirect.com
shown.
Name
Qty
Name
Qty
Shelf
1
Shelf
1
Assembly Instructions
Name
Bag of Screws
100mm gap as indicated.
100mm gap as indicated.
holes in the direction indicated.
shown.
Assembly Instructions
Assembly Instructions
Part
Name
Part
Name
2. Position part A & one of part B as
D.
Bag of Screws
6. Atornillaremos en los agujeros
D.
Bag of Screws
shown. Screw into place through the
2. Position part A & one of part B as
previamente marcados; y que se
pre-drilled holes in the direction
shown. Screw into place through the
encuentran
debajo
del
estante
indicated.
pre-drilled holes in the direction
inferior, para tal efecto en la dirección
indicated.
indicada en la imagen.
4. Position the completed section as
Qty
4. Position the completed section as
8. ¡Disfrútalo!
shown.
6.
Screw into place through the pre-drilled
6.
Screw into place through the pre-drilled
1
shown.
holes in the direction indicated.
holes in the direction indicated.
Email us your
Email us your
ideas@cosydirect
ideas@cosydir
alastair@cosydirec
alastair@cosyd
8. Enjoy.
8. Enjoy.
Qty
Qty
1
1
3.
7
7.

Publicidad

loading