Descargar Imprimir esta página

GE Profile PGP9830 Manual Del Propietario E Instrucciones De Instalación página 20

Ocultar thumbs Ver también para Profile PGP9830:

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION PREPARATION (Cont.)
3. PREPARING THE
COUNTERTOP (Cont.)
Carefully cut countertop opening according to the
opening is cut squarely, with sides parallel to each
from cutout to front edge; 2 3/8" minimum from
cutout to side edges of countertop.
4. PREPARING FOR DUCTWORK
NOTE:
NOT vent into a wall, ceiling, crawlspace, attic or
any concealed space.
Cut hole in cabinet wall or floor as appropriate for
between wall studs or floor joists.
NOTE: When cutting or drilling into wall or ceiling,
do not damage electrical wiring and other hidden
utilities. Make sure that any opening/cutout in the
wall behind the appliance and in the floor under the
appliance are sealed properly.
"
9
8
3 4
Rear Wall Venting
Installation Instructions
±
±
"
"
8
5. BLOWER TO DUCTWORK
ALIGNMENT
because it can cause severely restricted airflow.
However, if the blower outlet and the floor or wall
best.
NOTE:
of 6".
collapse.
possible to eliminate as much of the corrugation
as possible.
available at your local building supply store.
NOTE: Illustrations are for planning purposes only.
"
6
8
Centerline
to
Centerline
Offset
(Requires 3
4
49-2001159 Rev. 0

Publicidad

loading