INSTALLATION PREPARATION (Cont.)
3. PREPARING THE
COUNTERTOP (Cont.)
Carefully cut countertop opening according to the
opening is cut squarely, with sides parallel to each
from cutout to front edge; 2 3/8" minimum from
cutout to side edges of countertop.
4. PREPARING FOR DUCTWORK
NOTE:
NOT vent into a wall, ceiling, crawlspace, attic or
any concealed space.
Cut hole in cabinet wall or floor as appropriate for
between wall studs or floor joists.
NOTE: When cutting or drilling into wall or ceiling,
do not damage electrical wiring and other hidden
utilities. Make sure that any opening/cutout in the
wall behind the appliance and in the floor under the
appliance are sealed properly.
"
9
8
3 4
Rear Wall Venting
Installation Instructions
±
±
"
"
8
5. BLOWER TO DUCTWORK
ALIGNMENT
because it can cause severely restricted airflow.
However, if the blower outlet and the floor or wall
best.
NOTE:
of 6".
collapse.
possible to eliminate as much of the corrugation
as possible.
available at your local building supply store.
NOTE: Illustrations are for planning purposes only.
"
6
8
Centerline
to
Centerline
Offset
(Requires 3
4
49-2001159 Rev. 0