3.
COMMISSIONING
3.1 Commissioning Procedure
A pre-condition for commissioning is the complete and tested installation of all components, or the
completion of any maintenance work or malfunction rectification.
MF-7:
After checking that the rubber seal has been correctly inserted in the lid, the filter lid is
closed and the clamping device tightened.
MF-31/-54:
After checking that the rubber seal has been correctly positioned on the edge of
the filter casing, the lid is closed, and the diagonally opposing screws are tightened using the
special
key.
Opening the inlet tap.
When filling filter type MF-7 by opening tap A (see Appendix), the pin of the air-escape valve (in the
centre of the lid) must be pressed down until water escapes.
In the case of MF-31/-54, the air-escape tap in the centre of the lid is to be left open until water
escapes. As soon as this occurs, it is to be closed.
The filter is now ready for use.
4.
MAINTENANCE INSTRUCTIONS
To ensure that the system functions properly, it is extremely important that the mechanical
components be maintained regularly and meticulously by authorised personnel.
If a maintenance agreement has been made with a company authorised by Katadyn, all work
associated with maintenance must be carried out by the authorised maintenance personnel.
4.1 Safety Regulations
Every precaution is to be taken to ensure the safety of the authorised maintenance personnel.
The internal pressure of the water-conducting components is to be relieved by opening the drainage
tap after the shutoff devices have been closed.
The authorised maintenance engineer undertakes to check adherence to these safety precautions
before carrying out his work.
4.2 Maintenance Procedure
The safety regulations are to be observed.