Descargar Imprimir esta página

Cinderella TRAVEL Manual De Instalación página 4

Ocultar thumbs Ver también para TRAVEL:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 50
INSTALLATION
SKETCH OF AN
INSTALLATION
PLACING THE TOILET
The toilet has a Build-in module that must be built into the wall. You can also create a box around the
Build-in module. Clearance between Build-in module and rear wall is recommended, approx. 5 mm.
Please note that recommended panel thickness is 8 mm, and a thicker panel will reduce the space for
insulation around the exhaust hose. Sufficient insulation space must be maintained, in order to main-
tain the insulation properties.
If the floor is molded in a hard plastic material, preventing you from placing the toilet where you would
prefer it, the material may need to be removed, and a new floor installed, unless it is possible to modify
parts of the floor. You should consider that the ash container insert regularly must be emptied. This will
require at least 40 cm space in front of the toilet. There must be at least 5 cm clearance on each side of
the toilet but keep user comfort in mind and provide extra space if possible.
The toilet has four fixing points to the floor. Remove ash container for access. If the bathroom has floor
heating, take precautions when fixing the toilet to the floor. We also recommend that you place bowl
liners in near and easy reach of the toilet for ease of use and to ensure correct use. Two different bowl
liner holders are available from reseller/producer.
EXHAUST AIR
Exhaust hose with insulation is fed from roof feed-though flange to the toilet and secured at each end
with a powerful hose clamp that is included in the installation kit. Avoid horizontal stretches (max. 60
cm) and turns as far as possible as this creates counter pressure and will cause increased stress on the
toilet over time and the possibility of overheating. Bends should be as gentle as possible. Under no
circumstances should negative fall or sharp 90° bends occur as this will cause overheating of the
product. The insulation must not be squeezed as this affects the insulating and special care must be
taken for proper sealing in both ends. Exhaust hose should be mounted to toilet and feed-through
flange with sealant paste around the exhaust to avoid leakage.
On top of the roof feed-through flange, a chimney cap is mounted, this is included in the toilet box.
If there are larger objects within one meter of chimney cap, or if there is snow on the roof that can
prevent air flow, an extension must be mounted between the flange and the chimney cap.
The roof feed-through flange must be placed in a flat area of the roof, to ensure proper sealing. Find a
suitable place where the flange makes good contact with the roof and make a hole in the roof with an
83 mm hole saw. Take precautions when making the hole through the roof, to avoid electric cables.
Be sure to use enough sealant between the flange and roof to ensure no water ingress. Roof feed-
4
Chimney cap
Roof feed-through
Insulation
Exhaust hose
Inspection hatch
Build-in module
Inlet air hose
Inlet air flange
Illustration 1

Publicidad

loading