Descargar Imprimir esta página

dirna Bergstrom bycool green line INTEGRAL POWER Instrucciones De Montaje página 21

Ocultar thumbs Ver también para bycool green line INTEGRAL POWER:

Publicidad

Idiomas disponibles

Idiomas disponibles

INTEGRAL POWER
Tighten (4) M8 nuts to the support piece and
14
(4) to the base of the Compact.
Connect the unit cabling to the front.
15
Position the front on the front studs with (1)
16
M6 wide-rimmed washer and (1) M6 nut on
each stud. Tighten the nuts until the foam
duct piece comes up against the unit's upper
foam.
Important: The foam duct unit must come
up against the unit's upper foam in order to
prevent any leakages of air.
16
EPDM
seal
Cabin ceiling
Upholstering
Connect the recirculation sensor to the
17
cabling.
Base
D
(A)
M6 Nut
M6 stud
1 mm.
M6 Hexagons
Air conditioning for vehicles
Rubber ductings
17
21
EN
14
EPDM gasket
Compact front
with windows

Publicidad

loading