3 INSTALLATION WORK
This manual provides operational instructions for HARC-BX E from installation to turning
on the power source. The procedure of the instruction is described in the table below.
Handling Procedure
No.
1
Selection of Installation Position
2
Installation Work
3
Wiring Connection Manner
4
Setting of Dip Switch
5
Power Supply
3.1. Selection of Installation Place
Select a suitable place to install as applicable to the following conditions:
1. The appropriate installation place should be as described in Preface of this manual.
2. The installation place should be within the grounded Control Panel made of metal.
3.2. Installation Procedures
1. Install the HARC-BX E by keeping the screw terminal board at the lower side.
Upper
Downward
Correct
INSTALLATION WORK
Items
The precautions on the installation
Installation Method and its precautions
Power Supply and Wiring Procedure for
Communication
Description of Dip Switch and its Setup
Method
Points to be checked
✕ ✕ ✕ ✕
Incorrect
/
3
Contents
(Horizontal Installation)
Correct
7