All manuals and user guides at all-guides.com
Step 3
WIRING
1. Connect the BL-AG to the solenoids as described below.
Use 9V pulse valves only.
S SC 1 2 3 4
2. (Option) If you want to install a rain sensor, cut the yellow wire of
the BL-AG and connect it to the sensor.
Black
Red
9