Descargar Imprimir esta página

Master TOSCA2 Instrucciones De Instalación página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

TOSCA2
Installation of the HTS1000 box
Make a hole on the wall compatible with the dimensions of the box
(285.4x196.4x70 mm) in a position suitable for the operator (1.6 m from the nished
oor is recommended). Break through the pre-fractures necessary to pass the hoses
prepared for the power supply and Ethernet cables. Pass the hoses and place the
box in the hole. Pass the wires and cables, and connect the earth wire to the holes
(d) through a self-tapping screw (not supplied).
We recommend to:
Use the eyelets (c) to keep the box still.
Ÿ
Pay particular attention that the box is level (use
Ÿ
a spirit level)
Pay particular attention that the box front
Ÿ
edge is ush with the nished wall.
Secure the box with mortar and wait for it to dry
according to the provisions of the product used.
a. References depth (No.4)
b. Pre-fractured cable entry (No.26)
c. Eyelets (No.3)
d. Earthing holes (No. 2)
e. Monitor screw holes (No.4)
12Vdc 
Router
Ethernet
Vesta
installation instructions
A
C
B
D
E
Tosca2
Device installation
OOnce the Master HTS1000 metal box has been mounted ush to the wall, provide
the wiring necessary to the device:
12Vdc power supply (at least 2A) with the supplied terminal. PAY ATTENTION
Ÿ
TO THE SIZING OF THE WIRES/CABLES SO THAT THE NOMINAL VOLTAGE
REACHES THE MONITOR.
Cat.5 or Cat.6 Ethernet cable coming from the router or from the Vesta board
Ÿ
(in this case we recommend a Cat.5 or Cat.6 cable in cross con guration)
12V
+
-
Connect the 12Vdc power supply and the ethernet cable as shown.
Fix TOSCA to the recessed box using the 4 screws supplied.
fixing holes
fixing holes
At the end of the installation, activate the software and insert the plate into the
appropriate hooks.
EN
Ethernet
Master Srl Divisione Elettrica
Via M. Tognato, 16 - 35042 Este (Padova)
www.master.it - www.domologica.it

Publicidad

loading