Descargar Imprimir esta página

Midea NS12-13C1E Manual De Instrucciones página 13

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 33
ASSEMBLY
Assemble the main body of the heater and the base plate as follows:
1. Remove the butterfly nuts from the bottom of the main unit.
2. Place the main unit on a flat surface with the heater elements uppermost.
3. Fit the base plate to the bottom of the main unit. Match the projections on the
main unit with the cut outs in the base plate.
4. Fit the butterfly nuts through the base plate and screw them firmly into the
bottom of the main unit.
5. Pass the mains cord through the cord guide channel and fit the guide cover.
OPERATING INSTRUCTION
1. Insert the plug into a suitable socket.
2. Ensure that the unit is placed on a firm level surface. The unit may not operate
if it is placed on an uneven surface, as the tip-over switch may not operate.
3. Press the Power switch to the ON position. The upper and centre elements will
operate. The remaining tube can be switched on by pressing the 1200W switch
for full power.
4. Press the Oscillation switch to activate the oscillating feature of the main unit.
5. After use, turn off all the switches and remove the main plug from the wall outlet.
WARNING: The push rod of the tip-over switch must be free to move and should
never be tampered with or jammed into position as this will disable the safety tip-
over protection circuit.
SAFETY CONTROL
Your heater is fitted with a safety device thermal fuse that Shuts off the heater by
thermal fuse in the event of overheating or malfunction and not operates by some
other accidental reason.
If overheating or malfunctions continue, return the heater to an Approved Service
Agent for examination.
The most common cause of overheating is deposits of dust or fluff entering the
heater, Ensure these deposits are removed regularly by unplugging the unit and
vacuum cleaning air vents and front grille.
4

Publicidad

loading