Descargar Imprimir esta página

Parkside PTBS 30 A1 Instrucciones De Uso página 29

Ocultar thumbs Ver también para PTBS 30 A1:

Publicidad

Idiomas disponibles

Idiomas disponibles

Assembly
NOTE
Spread out the distributor
tubes q/w and leave them
in the sun for one to two
hours to make them easier to
straighten.
Use sharp all-purpose scissors
to cut the distributor tubes
q/w. Straighten and deburr
the cut with a cutter if neces-
sary.
Use the long hose holders 0
for the wide distributor tubes
w and the short hose holders
9 for the narrow distributor
tubes q.
Lay out the wide distributor
tube w and cut it into the re-
quired lengths. Cut the ends of
all distributor tubes w straight.
Connect the required L- and
T-connectors 2/3 with the
cut-to-size distribution pipes w.
GB │ MT
26 
IB_383526_PTBS30A1_LB5.indb 26
IB_383526_PTBS30A1_LB5.indb 26
Connect the T-reducers 4 to
the distributor tubes w in the
locations where you line them
up with the rows of your plants.
Connect the end plugs 5 to
the distributor tubes w at the
points where you do not wish
to connect anything else.
Place the inline drippers 8
near the roots of the plants
to be watered.
PTBS 30 A1
10.11.2021 14:37:01
10.11.2021 14:37:01

Publicidad

loading