Descargar Imprimir esta página

ELGA VEOLIA PURELAB Chorus 2 Guia De Inicio Rapido página 6

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 29
SET - UP
1a
MODULAR STACKING BENCH MOUNTED RESERVOIR ON TOP (OPTIONAL)
a. Open doors and undo quarter turn
fasteners.
c. Remove bolt and lift the lid.
WARNING!
ONLY PLACE ONE CHORUS SYSTEM ON TOP OR BELOW THE RESERVOIR.
Remove carefully
b. Remove front panel and undo lid bolt
with an allen key. (6mm AF FXBOYR301716)
d. Place the reservoir on top, lining up
with the three points. Screw in allen
head bolt, before replacing front panel.

Publicidad

loading