2. Installation and Set-up
2
Illustration 2.11: Country
The inverter will start automatically if sufficient solar radiation is available. The start-up will take
a few minutes. During this period, the inverter will carry out a self-test.
12
The inverter only complies with local and national standards provided the correct
country has been selected. If a different country than the one the inverter is installed
in is chosen it can have serious consequences.
Press '
' to scroll down through the list of
▼
countries. Select the country in which the in-
verter is installed by pressing 'OK'. Confirm
selection by pressing 'OK'
The settings for the selected country has now
been activated, and the inverter is ready to
energise the AC grid.
L00410352-02