Lay gate components on a smooth, flat and clean
1
surface. Begin by arranging the rails in the
correct orientations.
For Full Privacy With Two Rails:
2a
a. Apply provided vinyl cement to all inside surfaces
of the uprights where the rails will be installed
(Fig. 1).
b. Install top and bottom rail in the orientation
shown (Fig. 2).
c. Install infill boards. The ends of the infill will fit
inside the channel of the upright (Fig. 3).
d. Add vinyl cement to second upright and install as
shown (Fig. 4).
Top Rail
Fig. 1
Fig. 2
Bottom Rail
Fig. 3
Fig. 4
3