Descargar Imprimir esta página

Viper AS380/15B-EU Manual Del Usuario página 8

Ocultar thumbs Ver también para AS380/15B-EU:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 67
an authorized Service Center.
This Manual describes only the easier and most common maintenance procedures.
For other maintenance procedures shown in the Scheduled Maintenance Table, refer to the Service
Manual that can be consulted at any Service Center.
Procedure
Battery charging
Squeegee cleaning
Brush cleaning
Tank and vacuum grid with float cleaning, the
cover gasket check
Squeegee blade check and replacement
Solution filter cleaning
Out-water pipe filter cleaning
Screw and nut tightening check
rotary parts getting lubricant
Brush/Pad-holder motor carbon brush check or
replacement
Vacuum system motor carbon brush check or
replacement
(1) And after the first 8 working hours.
(2) This maintenance procedure must be performed by an authorized viper Service Center.
Daily, after
using the
Weekly
machine
Every six
yearly
mouths
(1)
(1)
(2)
(2)

Publicidad

loading

Este manual también es adecuado para:

As380/15b-uk