Installation (continued)
4
Back to back installation
□
If the hot and cold inlets are reversed (hot on
right and cold on left), remove bonnet nut (1)
from the valve body (D) with reversed supply
connections. Rotate the cartridge (2) 180°,
so H appears on the right. Install the cartridge
making sure that the key is fully engaged with
the slot in the valve body (D). Slide the bonnet (1)
over the cartridge (2) and thread them onto the
valve body (D). Hand tighten securely. If you are
not making a reverse or back to back installation,
skip this step and continue with the step 5.
NOTE: Never install the valve body (D) upside down!
Reverse
installation
3
2
1
Cold
H
Reverse installation
Normal
installation
(changes
not required)
Cold
D
Hot
Hot
H
Normal installation
Hot
5
Flushing the water outlets
and checking for leaks
□
Make sure the stop valves (1) are fully open.
If the stop valves (1) are closed, you must fully
open the stop valves (1) with the flathead
screwdriver.
□
Attach the handle assembly (G) by threading the
base of the handle assembly (G) onto the valve
body (D) and turn the handle assembly (G) to the
full on mixed position. Turn on the hot and cold
water supply lines and allow the water to flow
from the outlets for one minute, or until all foreign
matter has been flushed out. Check for leaks.
□
Shut off the water at the faucet and supply lines.
Check for leaks. Remove the handle assembly (G).
NOTE: Check for leaks:
a. Turn off the integral stops, check if there are any leaks
on both of the inlet water supply connections.
b. Fully turn on the integral stops and use plug/cap to
block the outlets of shower head and spout, then turn on
the water and check if there are any leaks on the outlet
pipe/tube connections or elbows.
1
Cold
G
9
Please contact 1-855-HD-GLACIER for further assistance.
1
D
HOMEDEPOT.COM