Check to make sure that all these parts were included in your packaging:
Valve for Gyrostream Bodyspray (TS1B)
Valve with Plaster Guard
Gyrostream Bodyspray (TS100J)
Bodyspray Assembly
IM PORTANT: For proper installation and
smooth operation, the valve must be level
and square to the finished wall.
1) Install the valve so that the outside surface
of the finished wall will be between the Max
and Min markings on the plaster guard.
Make sure the valve is installed with the
small arrow pointing upward.
The plaster guard should remain in place
until you are ready to install the trim.
IM PORTANT: After installing the valve, make
sure the two adapters packaged with the
valve are not discarded or lost. These
adapters are essential for installation of the
TS100J Gyrostream Bodyspray after the wall
surface has been finished.
INCLUDED PARTS
Faceplate
INSTALLATION PROCEDURE
Installing the Valve (TS1B)
2" (50mm)
Adapters (1 Short, 1 Long)
Set Screw & Hex Wrench
Finished
Wall
2" (50mm)
Adapters (2)
3
3/8" (35mm)
Small
Arrow
Max 95 mm (3.75")
Min 65 mm (2.5")
3/8" (35mm)