2
FIT AND SECURE
2.1
To achieve this installation you will need to remove the Interior roof lining and then the factory roof rails.
2.2
2.3
2.4
FATF005_REV_A00
Place a bead of sealant in and over each
hole in the roof, then place a spacer over
each hole.
Place item 14 over the rear holes,
item 16 over the middle holes and
item 19 over the front holes.
Join the two sections of the foot rails
with the supplied splice plate (Item 18).
Fasten as shown with items 11, 12
4mm
and 13. Fit item 3 over each nut after
fastening the bolts.
10mm
Place the assembled foot rail
onto the spacers and secure with items
4, 5 and 6 using the nut plates, item 15,17
and 20 on the inside of the roof.
Place a bead of sealant on the nut plates
top side before securing them.
10mm
See diagram 2.5.
Tighten all the nuts and bolts securing
the foot rails to the vehicle's roof.
Place a M6 Nut Cap (Item 1) over each
of the M6 Nuts and Hex Bolts.
3
© COPYRIGHT 2016 FRONT RUNNER VEHICLE OUTFITTERS
13mm