Installation
1.Unpack and inspect reel for damage. Turn by hand to check for smooth operation.
Check for completeness.
2.The cable reel must be installed in premises conforming to current regulation and
standards covering systems and work environments.
3.Secure the cable reel to the wall and the ceiling according to the installation
diagrams. You will need to purchase appropriate hardware for mounting your new
reel. Using screw anchors or suitable screws which must be fitted in the holes in
the brackets.
a)The reel base has three 8.5mm drilled holes for mounting on a suitable flat surface.
b)Using the three holes in the base, mount the reel in the desired location. Be sure to
use appropriate hardware and tighten securely.
4.If cable stopper adjustment is required, pull cable form reel and allow to latch at
desired length. Loosen stopper bolts, and slide stopper to a position close to the
cable guide. Tighten stopper bolts, and unlatch the reel.
5.Double adjustm ent function, see below the picture. Adjust the latch spring to left
position, could lock the cable at any desired length. Adjust the latch spring to
opposite position, have non-lock function, then cable can be freely moved.
Operation
1.Check reel for correct operation by slowly pulling out cable. A "clicking" noise will
be heard every half revolution of the drum.
2.To latch the reel, pull out the cable and allow it to retract after hearing the first
second or third "click".
3.To unlatch, slowly pull out the cable until the "clicking" noise stops, then let cable
retract until the cable stopper rests against the cable guide.
4.When over loading, the thermal cut-out will cut off automatically, then push the red
button until restore.
Wall
Ceiling
3