Descargar Imprimir esta página

GE AHW05 Manual Del Propietário página 12

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions
4. INSTALL THE AIR CONDITIONER
IN THE WINDOW
A. Mark the center of the window. Set the air
conditioner in the window so that is it centered.
Place the air conditioner so that front edge of the
bottom mounting rail is against the back edge of
the sill.
B. Bring the window down so that the front edge of
the top mounting is in front of the window. Make
sure that the air conditioner is level or tilting
slightly to the outside.
C. Extend the curtain panels until they fill the
window. Mark the location of the holes in each
panels in place.
12
Type B screws
5. SECURE AIR CONDITIONER
A. Loosen the screw on the right hand side of the
air conditioner near the bottom.
B. Slide a side bracket over the screw so that the
bracket is resting on the window sill. Tighten the
screw.
C.
window sill through the holes in the side bracket.
the window sill.
D. Repeat the side bracket installation on the left
side.
49-5000450 Rev. 2

Publicidad

loading

Este manual también es adecuado para:

Ahb05Ahw06