Descargar Imprimir esta página

GRAFF G-11657 Serie Instrucciones De Instalación página 6

Publicidad

1.
Ensure that there is sufficient grease on both o-rings (27). Hand
tighten tie down nut (21) onto shank (31).
2.
Using adjustable wrench securely tighten tie down nut (21) onto
shank (31). Repeat same procedure on other side. Turn water supply
on and pressurized faucet to check for leaks.
31
1.
Slide covers (29) down legs (28) and secure to flanges (31), it may
be necessary to twist and rotate cover (29) to aid in proper seating
onto flange (31).
2.
Attach inlet of check valve to lower outlet of body (9). Attach hex nut
of hose (22) to lower outlet of check valve. Operate faucet divert
from tub spout to handshower and check for leaks.
IOG 5217.00
ATTACH TO QUICK CONNECT  CONECTAR A LA CONEXIÓN RÁPIDA
28
29
21
27
5.1
1.
EAsegurarse de que haya suficiente grasa en ambas juntas tóricas de
la pata (27). Apretar manualmente la tuerca tensora (21) en el
vástago (31).
2.
Con una llave inglesa (21) fijar firmemente la tuerca tensora (21)
en el vástago (31). Repetir el mismo procedimiento en el otro lado.
Abrir el suministro de agua y el grifo presurizado para localizar
posibles pérdidas.
21
31
FINAL CONNECTIONS  CONEXIONES FINALES
1.
Deslizar las tapas (29) debajo de las patas (28) y fijarlas a las
bridas (31), puede ser necesario girar y rotar la tapa (29) para
facilitar el alojamiento adecuado en la brida (31).
2.
Conectar la entrada de la válvula de retención a la salida inferior del
cuerpo (9). Conectar la tuerca hexagonal del tubo flexible (22) a la
salida inferior de la válvula de retención. Accionar el desvío del grifo
del tubo de salida a la ducha manual y localizar posibles pérdidas.
6
28
29
5.2
Rev. 2 September 2020

Publicidad

loading

Este manual también es adecuado para:

G-11654 serie