Descargar Imprimir esta página

Beckett C90211 Manual De Instrucciones página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

HELPFUL SITE PLANNING HINTS
Waterfalls generally face the viewing area.
When building your Waterfall, keep in mind you will
need room for easy access to the Waterfall for
maintenance.
STEP 1:
Place the Hose Clamp over one end of the
Tubing.
STEP 2:
Attach the Tubing to the Adapter located at the
Waterfall's underside and tighten the Clamp to seal.
STEP 3:
Attach the other end of the Tubing to the
Pump.
STEP 4
: Place the Bio-Filter Foam in the bottom of the
Waterfall.
STEP 5:
Place your Lava Rock inside the Mesh Bag
and lay flat on top of the Bio-Filter Foam to prevent the
Foam from floating.
STEP 6:
Build a mound with dirt or stones for your
Waterfall to your desired height.
STEP 7:
Drape the Liner over the mound, including the
back of the mound.
STEP 8:
Place the Waterfall on top of the mound.
STEP 9:
Secure the mound and Waterfall with flat rocks
or bricks. Create a lip with the liner to drain possible leaks
back into the pond
STEP 10:
Place the Pump in the pond.
STEP 11:
Bury the Tubing.
STEP 12:
Fill the Pond with water.
STEP 13:
Read the following information about the
Pump, then plug the Pump into a GFCI receptacle.
STEP 14:
Enjoy your Waterfall!
Primary
Viewing
Area
GFCI
Mesh Bag
Lava Rock (Not Included)
Bio-Filter Foam
Waterfall
Clamp
Tubing
Pump
PVC Liner
Pond
Waterfall
Mound
of Dirt
-2-

Publicidad

loading

Productos relacionados para Beckett C90211

Este manual también es adecuado para:

Wfk8sM400