Descargar Imprimir esta página

Kuzar K-30 Manual De Usuario página 15

Publicidad

Operating Instructions - ENGLISH
4 - OPERATION.
4.1 - Place the tower on a flat and solid surface where it is going to be used.
4.2 - Remove the legs from their transport supports and insert them in their working po-
sition. Check that they are fully inserted and fixed with their safety lock.
4.3 - Ensure that the lifter is in a vertical position and use the spirit level located on the
base profile to check the bubble is centred. If necessary, adjust its alignment with the
stabilizer plates by turning the handle in the appropriate direction.
4.4 - Change the forks to their horizontal working position and fix them with the fastener
pins, place the load on the forks using a Kuzar Accessory if necessary, and ensure that
the tower is only used to lift loads vertically. The minimum load is 25 kg.
NEVER RAISE THE TOWER SECTIONS WITHOUT LOAD.
4.5 - Elevation:
4.5.1 - Ensure that all the KAT locks are in the
BLOCK position.
4.5.2 - Change the nº1 KAT lock to the LIFT position.
4.5.3 - Turn the handle clockwise to raise the lifting
carriage of the tower.
4.5.4 - When you have reached the desired height,
fix the nº1 KAT lock in by turning the handle anti-
clockwise. Change the nº1 KAT lock to the BLOCK
position.
4.5.5 - Change the nº2 KAT lock to the LIFT position.
4.5.6 - Turn the handle clockwise to rise the next section of the tower.
4.5.7 - When you have reached the desired height, fix the nº2 KAT lock in by
turning the handle anti-clockwise.
Check that the nº2 KAT lock has introduced in to its corresponding hole.
And change the nº2 KAT lock to the BLOCK position.
4.5.8 - Repeat these steps to raise all the sections of the tower, changing all
the KAT locks left orderly to the LIFT position and turning the handle clockwise.
K-30
1
2 3 4 5
15

Publicidad

loading