Descargar Imprimir esta página

Palmako PAY44-4242 Manual De Montaje página 10

Ocultar thumbs Ver también para PAY44-4242:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 36
Installation manual - English
When the second element has been attached to the rafter, screw both elements together with 5x90 mm
screws. It is recommended to drill the holes first so that the connection of the elements would be stronger.
The rest of the roof elements are assembled the same way.
Usually the installation of the last roof component is the most complicated. If there will remain a gap
between the elements unscrew the elements from the walls and push them upwards. On the right place fix
the elements again with at least 4 screws of 5x90 mm.
On the contrary, if there will remain too little space for the last element, all the elements should be pushed
downwards.
In pavilion PAY44-5742 install the part pos. 160. Fix it with 6x120 mm screws (10 pieces).
Finally, the metal roof cap needs to be installed (NB! Not included in some house kits!).
Assembly of eave edgings
Attach the eave edgings pos. 100 (in pavilion PAY44-5742 pos. 100 and pos. 101) to the roof elements
with screws. Use 4.5x50 mm screws. Ideally the top side of the eave edging should be on the same line
with the top side of the roof board.
Floor
Start assembling the floor from centre
with longest, 90˚ floor boards (pos. 061).
Leave gaps of 0,5-0,7 mm between the
boards. That is needed to allow floor
boards to expand according to weather
conditions.
Place the floor boards in the centre of
the floor so that groove meets groove.
Groove needs to be filled with fitting
slats (pos. 150).
After middle section of floor being
assembled, move on to the sides of the
floor with 45˚ floor boards. Don't forget
to leave small gaps of 0,5-0,7 mm
between boards. The last and shortest
floor board must be cut to the right size.
Floor boards should be fixed to every
foundation bearer with 2,5x50 mm nails.
Assembly of floor beadings
The floor beadings need to be cut to the
right size. Fix the floor beadings with
1,4x40 mm nails.

Publicidad

loading