41
P
43
Optional: Adapter socket 62400001
7-pin
44
Set up trailer operation
46
87030705/26.06.2018
SETUP
1.
4.
13-pin
PF Jones Ltd, Nuttall street, Old Trafford, Manchester, M16 9JA / Tel- 0161 872 4755 / email- info@pfjones.co.uk / web- www.pfjones.co.uk
42
2.
Ignition ON
P
45
The activation of
• trailer indicator monitoring
• PDC deactivation
has to be carried out using the CITROËN Lexia 3-
Tester as follows:
• remote loading / remote coding
• installation / de-installation
• selection vehicle type
• trailer control unit (BSR)
• installation of equipment
1x
3.