Descargar Imprimir esta página

Glacier bay HD66289W-6101 Guía De Instalación Y Cuidado página 8

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
9
Making the water supply
connections
Use 1/2 in. I.P.S. faucet connections (2), or use
supply line coupling nuts (3) (not included) with
a 3/8 in. O.D. ball-nose riser (1).
Use wrenches to tighten the connections. Do not
overtighten.
Operation
1
Flushing and checking for leaks
Ensure the faucet (A) handle is in the off
position, and turn on the water supply to check
for leaks. If you discover any leaks, check your
connections to ensure they are installed properly.
Turn on the hot and cold water handle to allow
the water to run for at least one minute. This
ushes away any debris that could cause
damage to internal parts.
Turn off the water.
1
3
8
2
A

Publicidad

loading

Este manual también es adecuado para:

Hd66289w-6104