Descargar Imprimir esta página

Powerworks PRL110 Manual Del Operario página 8

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 58
Installation
EN
Read the entire section before beginning installation. Installation affects mower capability.
Plan the installation carefully.
The following are the main tasks within the installation:
Planning layout and preparation
Installing and connecting the charging station
Connecting the power supply
Initial charging of the battery
Installing the boundary wire
Installing the guide wire
Calibrating and initial start up
Planning Layout and Preparation
Ensure that the following conditions exist in the operating area where the mower will be used:
The grass is shorter than 10 cm.
There are no stones, loose pieces of wood, wire, live mains cables, and other foreign objects.
The operating area is even and has no ditches, grooves, and steep slopes greater than 35%.
The following tools are required for installation, but not included:
Hammer/rubber mallet to drive the pegs into the ground
Combination pliers to cut the boundary wire
Polygrip to press the couplers together
Hex key, 6 mm for securing the charging station to ground
8
POWERWORKSTOOLS.COM

Publicidad

loading

Este manual también es adecuado para:

Prl115