Descargar Imprimir esta página

Mounting On The Wall; Connecting The Condensation Drain - Zehnder ComfoFond-L Q Serie Manual Del Instalador

Ocultar thumbs Ver también para ComfoFond-L Q Serie:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 72

4.2 Mounting on the wall

Mount the ComfoFond-L Q against a wall with a
minimum mass of 200 kg/m
frame (available as an optional extra) must be used
for other walls. (see appendix: Mounting pictures).
This reduces contact noise as much as possible.
Make sure to leave a minimum space of 110 cm
in front of the ComfoFond-L Q to perform any
necessary maintenance work.
ComfoFond-L Q TR
1. Align the wall mounting bracket supplied with the
unit to the wall, ensuring it is level and on a flat
surface. The suspension bracket should be fitted
at the same height as that of the ventilation unit
(see appendix: mounting pictures).
2. Place the ComfoFond-L Q in the wall mounting
bracket.
3. Rotate outdoor connecter bend (A) of the
ventilation unit and connect it to the supply air of
the ComfoFond-L Q.
A. Outdoor air connector bend
C. Exhaust liquid connector
4. Fit the condensation drain to the underside of the
ComfoFond-L Q, as described in the chapter on
mounting the condensation drain.
5. Fit the fluid circuit (subsoil heat collector),
including the boiler safety group, to the exhaust
side (C) of the ComfoFond-L Q, as described in
the chapter on mounting the fluid circuit.
6. Connect the 2 electrical cords of the
ComfoFond-L Q to the ventilation unit, as
described in the chapter on mounting the
electrical connections.
ComfoFond-L Q ST
1 Align the wall mounting bracket supplied with the
unit to the wall, ensuring it is level and on a flat
surface. The suspension bracket should be fitted
at the same height as that of the ventilation unit
(see appendix: mounting pictures).
2. Place the ComfoFond-L Q in the wall mounting
bracket.
EN - 20
. The Zehnder support
2
A
3. Place the metal sleeve joint / 180-160 adapter (A) on
the spigot (outside air) of the ventilation unit.
Use the 180-160 adapter to connect the
ComfoFond-L Q to the ComfoAir Q 350 ST air
connection.
Use the metal sleeve joint to connect the
ComfoFond-L Q to the ComfoAir Q 450 or 600
air connection.
4. Use the EPP sleeve joint to connect both 90º
connection bends (B).
5. Place the connected 90º connection bends on
the metal sleeve joint / 180-160 adapter (A) of
the ventilation unit and the air exhaust of the
ComfoFond-L Q.
A
A. Metal sleeve joint / 180-160 adapter
B. EPP sleeve joint
C. Exhaust liquid connector
6. Fit the condensation drain to the underside of the
ComfoFond-L Q, as described in the chapter on
mounting the condensation drain.
7. Fit the fluid circuit (subsoil heat collector),
including the boiler safety group, to the exhaust
side (C) of the ComfoFond-L Q, as described in
the chapter on mounting the fluid circuit.
8. Connect the 2 electrical cords of the
ComfoFond-L Q to the ventilation unit, as
described in the chapter on mounting the
electrical connections.

4.3 Connecting the condensation drain

Take account of the following factors (see also
Appendix: Condensation drain pictures)
when fitting the condensation drain:
The condensation must be drained off frost-free,
at a gradient, using an appropriate siphon;
Connect the condensation drain (air-tight) via a
pipe or a hose with a siphon (with a water seal of
at least 60mm) to the sanitary pipework;
Position the upper edge of the siphon at least 60
mm underneath the condensation drain of the
ComfoFond-L Q.
The condensation drains of the ComfoFond-L
Q and the ventilation unit must have a seperate
siphon. Do not connected them directly to the
same Siphon.
B

Publicidad

loading

Este manual también es adecuado para:

Comfofond-l q stComfofond-l q tr